Dassault Falcon 7X Practice Exam 2025 - Free Falcon 7X Practice Questions and Study Guide

Question: 1 / 455

What is required for the RAT to recharge the two batteries?

APU must be engaged

RAT must be deployed and the Bus Tie closed

The correct answer involves the necessity of deploying the Ram Air Turbine (RAT) and closing the Bus Tie in order for it to recharge the two batteries. When the RAT is deployed, it generates electrical power from the airflow as the aircraft is in motion, which can be used to recharge the batteries. Closing the Bus Tie allows the electrical power generated by the RAT to be distributed to both battery systems, facilitating their recharging.

In contrast, the other options refer to conditions that do not specifically enable the RAT to charge the batteries. For instance, the Auxiliary Power Unit (APU) being engaged may provide electrical power for various systems, but it is not a requirement for RAT operation. An external power source is also not necessary for the RAT to function, as it operates independently based on airflow. Lastly, the requirement for only battery #2 to be operational does not align with the function of the RAT, which is designed to recharge both batteries when connected appropriately.

Get further explanation with Examzify DeepDiveBeta

External power source must be available

Only battery #2 must be operational

Next Question

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy